Children's Health Queensland - Head to Health
Chermside
PROJECT SUMMARY:
BELNIC was engaged by Children's Health Queensland to deliver the Head to Health facility at Chermside. The tenancy was configured into a highly cellular healthcare environment incorporating six consult rooms, a medical, retreat and meeting rooms, reception, waiting and admin areas, open plan workstations and staff breakout facilities.
Noisy and disruptive works were programmed out of hours to minimise the impact on existing building operations. Site constraints also presented an interesting challenge when it came to installing the new rooftop condenser units. With crane access restricted by the building location and surrounding residential properties, BELNIC engaged a specialist contractor to develop a temporary rigging system within the fire stair to allow the units to be lifted through the stairwell and transferred onto the roof.
PROJECT DETAILS:
Construction: 10 weeks
GFA: 705m2
Location: Chermside

PROJECT FEATURES:
Design + Construct including multidisciplinary services coordination
Working in a live office building
Specialist rigging solution to transport condenser units through the fire stairs to the rooftop
Electrical and data installations to meet stringent CHQ ICT Standards
Complete security system including access control and duress
Open Plan workstation area for office staff, as well as treatment and consult rooms for patients
Operable wall + highly rated acoustic systems throughout
Full turn key solution including loose furniture + whitegoods.