PROJECT SUMMARY:
Expansion of the existing Queensland Xray Bayside practice allowed us to design and construct the a new PET facility with 6 Uptake Rooms, changing and WC facilities, control room, Hot Lab, hot wait and Doctor's Office. Whilst onsite, we also undertook a refurbishment of the existing live practice, which included reconfiguration of sections of the practice to facilitate creation of a new staffroom, additional ultrasound room and more spacious reception and admin areas. Cabinetry floor and wall finishes were refreshed throughout the existing practice.
PROJECT DETAILS:
Extension Construction Period: 10 weeks
Extension Project GFA: 200m2
Refurb Construction Period: 8 weeks
Refurb Project GFA: 210m2
Location: Cleveland, QLD
PROJECT FEATURES:
• Forming blockwork openings to join existing practice to extension
• Internal and external trenching for under slab drainage
• Core-filled blockwork for PET rooms
• Lead shielding installation & certification
• Shopfront modifications
• Refurbishment in an active base-build environment
• Out of hours working in existing practice to minimise disruption
• Management of Client engaged electrical contractor