Nucleus Network Laboratory + Consult Expansion
QIMR Herston

PROJECT SUMMARY:

We worked with Nucleus Network to reconfigure some of their redundant space into a new laboratory and ancillary support rooms; create additional offices for the Doctors; increase their consultation capacity by creating an additional 6no consult rooms, and upgrade their reception area.

Works were completed in a live environment, and in stages that ensured the flow of patients and staff operations continued, uninterrupted.

PROJECT DETAILS:

Timeline: 11weeks (2 stages)

Project GFA: 500m2

Location:  QIMR Berghofer Research Institute, Herston

 

PROJECT FEATURES:

  • Design and Construct 

  • Laboratory, including chemical resistant joinery and safety shower

  • Nurse Call

  • AS3003 Body Protection in clinical areas

  • Synchronized master clock system

Nucleus Network Laboratory