PROJECT SUMMARY:

Refurbishment of the existing IROC area to provide a general freshen up, and to provide provisions of additional power for upgrade of control desk monitors and future proofing

PROJECT DETAILS:

Timeline: 10days 

Project GFA: 1000m2

Location:  480 Queen St, Brisbane

PROJECT FEATURES:

  • Active base-build environment, conducting refurbishment works within a specific timeframe each day to ensure the IROC was fully accessible for the incoming night shift

  • Refurbishment of Kitchenette stone and reskin of all joinery;

  • Paint + deep clean throughout IROC areas including vinyl, broadloom carpet, active chilled beams, ceiling fins and lights

  • Staged uplift and replacement of 900m2 of carpet tiles, whilst workstations and control desks remained in-situ

  • Investigative works to ensure there was sufficient power to cater for the increased number and upgrade to spec of monitors . 

  • Installation of new underfloor cabling to suit current power requirements and future proofing

  • Staged replacement of more than 400 computer monitors

  • We were pleased to be able to work with our flooring contractor  to repurpose/rehome the old carpet tiles, rather than seeing them go to landfill - packaging them up and distributing them to flood affected victims in Northern NSW, following the February 2022 floods. 