top of page

End of Trip Facility
135 Coronation Drive, Milton

PROJECT SUMMARY:

Design + construction of a market leading End of Trip facility at 135 Coronation Drive, to cater for the active transport needs of the surrounding tenants. 
 
"The synergy between Milton Green and the Bicentennial Bikeway served as design inspiration, as it is the cornerstone of how our customers travel into work each day." - Nakia Melody, AMP Capital

PROJECT DETAILS:

Timeline: 8 weeks

Project GFA: 240m2

Location:  Milton, QLD

 

PROJECT FEATURES:

  • Total reinvigoration of the previous end of trip that was devastated by the floods.

  • Sophisticated lobby and entry to B1 and B2, including acrylic pictogram way finding signage, linking Milton Green and the Bicentennial bikeway to this EOT Facility. 

  • Full height tiling, internally and in the lift lobby
  • Brushed Nickle fixtures
135 Coronation Dr EOT Facility 17
bottom of page